Conduit fill
fill = Σ (π d² / 4) / (π D² / 4) ≤ 40 %
- d = each cable’s outer diameter
- D = the conduit’s inside diameter
CCTV cabling wired on the plan: conduit routed from the rack to every camera, nearest to nearest.
The camera count and cable the rack’s conduit is sized from.
fill = Σ (π d² / 4) / (π D² / 4) ≤ 40 %
For reference. MO.tool works these out to help your design; the engineer remains responsible for it. Always check the edition of each standard your project uses and the requirements of the local authority (DEWA, ADDC, Civil Defence…).