STANDARDS & FORMULAS

Shop Drawing for CCTV

CCTV cabling wired on the plan: conduit routed from the rack to every camera, nearest to nearest.

Standards and regulations

  • IEC 62676-4
    Video surveillance systems - application guidelines

    The camera count and cable the rack’s conduit is sized from.

Formulas

Conduit fill

fill = Σ (π d² / 4) / (π D² / 4) ≤ 40 %

  • d = each cable’s outer diameter
  • D = the conduit’s inside diameter

Design rules it applies

  • Conduit routed from the rack to the nearest camera, then the nearest one from there
  • Numbering CAM-01 on, matching the CCTV tool

For reference. MO.tool works these out to help your design; the engineer remains responsible for it. Always check the edition of each standard your project uses and the requirements of the local authority (DEWA, ADDC, Civil Defence…).

Back to Shop Drawing for CCTV